Skip to main content

Week 2 (29/7/2019-2/8/2019)

On 31 July 2019, a workshop regarding Introductory Briefing is held at TTL1 at 3:00pm. The contents are about :
  1. Code, Credit & CLOs
  2. Assessments & Weightage
    - 20% Logbook/Blog
    - 35% FYP Exhibition Day
    - 35% Final Report
    - 10% Technical Paper
  3. Getting FYP 2 Information
    - Telegram
    - Unikl BMI FYP website
    - FYP2 Academic Calendar
    - FYP Committee
  4. Finalize FYP 2 Title
  5. FYP Project Claim
    - RM500 per student
  6. Misconception About FYP
  7. FYP Progress Report
    - Project planning
    - Project design
    - Description on the project block diagram and flow chart
    - Circuit description and operation
    - List of components used
    - PCB LayoutData collection/results
    -Conclusion
  8. FYP Thesis
    - Chapter 1: Introduction
    - Chapter 2: Literature review
    - Chapter 3: Methodology
    - Chapter 4: Results and Discussion
    - Chapter 5: Conclusion & Recommendations
  9. FYP 2 Activities


     
       On 1 August 2019, I print out the Change of Title Form from the UniKL BMI Final Year Project website. The reason is to make the title to be more specific on the task acquired by the heart rate device for blind people. Hence, my previous title which is "Heart Rate Measurement Device for Blind People at Home" is too common and general. The device should be user friendly and portable, so it is not specific to measure their heart rate at home. So after discussing the new title with my supervisor, Dr Jawad, we come out with "Self Monitoring Heart Rate Measurement Device for Blind Persons". The form has been approved by my supervisor and in process to change the title by FYP Coordinator, Dr Imran.



         The screenshot from UniKL BMI Final Year Project website regarding my new title has been approved by my FYP supervisor and coordinator.

Comments

Popular posts from this blog

Week 10 (30/9/2019 - 4/10/2019)

On 2 Oct 2019, a FYP 2 Briefing had been covering: FYP 2 Exhibition Day (Tips & Tricks) and Submission of Progress Report, Final Report & Technical Paper. Students were able to know the tips and how to present their projects during Exhibition Day. The speaker also brief on Submission of Progress Report, Final Report & Technical Paper. Next, a sketch has been made for this project. Google Sketch Up used to draw the casing of the project. A sketch need to be provided some Braille cell for guidance to the blind people.   Left View of the Project Right View of the Project

Week 15 (4/11/2019 - 8/11/2019)

Task: Updating Chapter 4. This chapter includes the findings explanation and the data analysis. During develop this project, most important things that need to be carried out were the objectives. Result 1: Accuracy of Pulse Sensor Circuit Analysis To determine the accuracy of the pulse detector circuit, an experimental analysis was conducted on the pulse sensor circuit. In patient monitor and pulse sensor, heart rate measuring is compared between the pulse oximeter. Here is the contrast between the pulse oximeter and the pulse sensor for reading the heart rate. Comparison of Heart Beat Accuracy between Pulse Oximeter and Pulse Sensor between Five Students Result 2: Classifier Analysis with Audio Output The purpose of this experiment is to determine whether the heart rate status generated by the earphone using Cytron EasyMP3 Shield is consistent with the current heart status displayed through Serial Monitor on Arduino IDE. This is to ensure that the audio was pr...